• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Southern Public Power District

PO Box 1687 / 4550 West Husker Hwy
Grand Island, NE 68802-1687
308-384-2350 / 800-579-3019

  • About Us
    • Vision, Mission & Values
    • History
    • Service Area
    • Board Agendas & Minutes
    • Board Members
    • Staff
    • Careers
      • Job Openings
      • Scholarships
    • Contact Us
  • Customer Service
    • Payment & Account Portal
    • Electric Service Application
    • Rates
    • Disconnection Of Service
    • Incentive Programs
    • Distributed Generation
    • Generlink
  • News
    • Customer News Magazine
    • Annual Reports
  • Community & Development
    • Operation Round Up
    • Energy Park
    • Our Communities
  • Safety & Efficiency
    • Apogee Energy Resource Center
    • Incentive Programs
    • Hotline Trailer Demonstrations
    • Notification of Oversized Load
    • Safety Tips
      • Indoor Safety Tips
      • Outdoor Safety Tips
      • Storm Safety Tips
  • Irrigation
    • Load Control Status
    • Rates
    • Irrigation Rate Calculator
    • Construction Policy
    • Load Management Newsletter
    • Power Factor

Commercial Conduit Incentive

  • 100% reimbursement (maximum of $1,000) for new commercial construction for the installation of conduit to be used for the future installation of an electric vehicle public charging station.

Qualifications:

  • Available to commercial customers of Nebraska Public Power District and its wholesale utility customers.
  • Only available to non-residential accounts.
  • Public charging station installation must be at a commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to SPPD with the two bid proposals and verification of installation.

Guidelines:

  • This incentive is for the installation of equipment for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV charging station.

    Load Requirements (exact requirements may vary):
    — Level 2: single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.

Next Steps:

  • Visit with SPPD to discuss your charging needs and pick up an application form which includes the approval section.
  • Submit final payment request after purchase and installation.

Additional Information:

Brochure
Application

Revised: January 2022

Footer

Links

Nebraska Power Association
Nebraska Energy Office
Diggers Hotline
Safe Electricity

Search

Current News

  

SouthernPPD Follow

Southern Public Power District. To report an outage call 800-579-3019.

southernppd
southernppd SouthernPPD @southernppd ·
25 Jan

Operation RoundUp is accepting applications for the first quarter through March 31. Applications and grant guidelines can be found on our website. https://southernpd.com/roundup/

Reply on Twitter 1618248059044896768 Retweet on Twitter 1618248059044896768 Like on Twitter 1618248059044896768 Twitter 1618248059044896768
southernppd SouthernPPD @southernppd ·
19 Jan

Most home fires caused by electrical malfunction or failure can be prevented. Learn more: https://bit.ly/3mRaN0x #SafeElectricity #HomeElectricalSafety #SPPD #poweringabrighterfuture

Reply on Twitter 1616104041972375555 Retweet on Twitter 1616104041972375555 Like on Twitter 1616104041972375555 Twitter 1616104041972375555
Load More...

Copyright © 2023 Nebraska Public Power District