• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Southern Public Power District

PO Box 1687 / 4550 West Husker Hwy
Grand Island, NE 68802-1687
308-384-2350 / 800-579-3019

  • About Us
    • Vision, Mission & Values
    • History
    • Service Area
    • Board Agendas & Minutes
    • Board Members
    • Staff
    • Careers
      • Job Openings
      • Scholarships
    • Contact Us
  • Customer Service
    • Payment & Account Portal
    • Electric Service Application
    • Rates
    • Disconnection Of Service
    • Incentive Programs
    • Distributed Generation
    • Generlink
  • News
    • Customer News Magazine
    • Annual Reports
  • Community & Development
    • Operation Round Up
    • Energy Park
    • Our Communities
  • Safety & Efficiency
    • Apogee Energy Resource Center
    • Incentive Programs
    • Hotline Trailer Demonstrations
    • Notification of Oversized Load
    • Safety Tips
      • Indoor Safety Tips
      • Outdoor Safety Tips
      • Storm Safety Tips
  • Irrigation
    • Load Control Status
    • Rates
    • Irrigation Rate Calculator
    • Construction Policy
    • Load Management Newsletter
    • Power Factor

Commercial Charger Incentives

  • 50% reimbursement for installation of equipment necessary for the installation of an electric vehicle public charging station.
  • The goal of this program is to expand the charging network across the state. Consideration of locations will prioritize these parameters: intersections of major highways, distance from the nearest charging station, availability of 24/7 accommodations, etc.
  • Pre-approval is required for verification of a benefit vs cost analysis.
  • Eligible grants, discounts, etc. are deducted from the total cost to determine the customer’s cost. This amount is eligible for a 50/50 cost-share.
  • The reimbursement is based on the lower of two qualified bids submitted to the utility.
  • Customers have a limited time to purchase, install and connect charging stations. If this time is exceeded, the incentive will expire 90 days after approval.

Qualifications:

  • Available to commercial customers of Nebraska Public Power District and its wholesale utility customers.
  • Only available to non-residential accounts.
  • Public charging station installation must be at a commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to utility along with the two bid proposals and verification of installation.

Guidelines:

  • This incentive is for the installation of equipment for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV charging station.

    Load Requirements (exact requirements may vary):
    — Level 2: single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.

Next Steps:

  • Visit with your electrical utility to discuss your charging needs and pick up an application form which includes the approval section.
  • Submit final payment request after purchase and installation.

Additional Information::

Brochure
Application

Revised: January 2022

Footer

Links

Nebraska Power Association
Nebraska Energy Office
Diggers Hotline
Safe Electricity

Search

Current News

  

SouthernPPD Follow

Southern Public Power District. To report an outage call 800-579-3019.

southernppd
southernppd SouthernPPD @southernppd ·
29 Mar

Be aware of electrical hazards after a flood. Downed power lines could be hidden by standing water, and the lines could still be energized: http://ow.ly/RE0p50N7Boj #SafeElectricity #FloodSafety #SPPD #PublicPower #PoweringaBrighterFuture

Reply on Twitter 1641097945738035201 Retweet on Twitter 1641097945738035201 Like on Twitter 1641097945738035201 Twitter 1641097945738035201
southernppd SouthernPPD @southernppd ·
27 Mar

Last chance to apply for a Lineworker Scholarship! Applications are being accepted through April 1. Discover more at: http://ow.ly/OwfJ50LyanL

Reply on Twitter 1640338452498591748 Retweet on Twitter 1640338452498591748 Like on Twitter 1640338452498591748 Twitter 1640338452498591748
Load More...

Copyright © 2023 Nebraska Public Power District